We expect GPSC’s core earnings to grow 35% YoY in 3Q26 to Bt1.3bn on reduced overseas associate losses and better operational availability at Gheco-One, though a 25% QoQ decline is likely as rising gas costs and lower domestic volumes squeeze SPP margins. We maintain an OUTPERFORM rating with a mid-2027 target price of Bt62 based on DCF valuation (WACC of 6.2%, terminal growth of 2%), supported by long-term capacity expansion targets under PDP2026, rising data center power demand, and potential upside from Avaada Energy’s 2027 IPO.
GPSC – 3Q26F: Core profit up YoY but down QoQ

3Q26 core earnings to increase YoY but soften QoQ. Core earnings are expected to reach Bt1.3bn in 3Q26, up 35% YoY, primarily driven by a sharp reduction in losses from the CFXD offshore wind project and a narrower loss at Avaada Energy, lifting equity income to Bt150mn from a Bt415mn loss in 3Q25. In addition, the Gheco-One power plant’s performance should improve YoY, supported by higher plant availability, better generation efficiency, and lower coal-related losses. The recovery should more than offset weaker domestic operations in 3Q26, where an 28% YoY increase in gas costs to Bt397/mmBTU, an 8% YoY drop in electricity sales volume, and the expiry of GSPP11 Phase 1’s EGAT contract are expected to compress gross margin by 1.3ppt YoY to 14.5%. XPCL’s contribution should also decline YoY from a high base with lower water flow YoY. On QoQ basis, we expect core earnings to decline 25% QoQ, mainly due to weaker SPP profitability as average gas costs rise 11% QoQ, while electricity sales volume declines 5% QoQ, compressing gross margin by 1.3ppt to 14.5%. We expect GPSC to report a 3Q26 net profit of Bt1.57bn, down 10% YoY and 14% QoQ, despite booking a one-off gain of about Bt222mn from the disposal of the Sheng Yang solar project in 3Q26.
4Q26 core profit is expected to soften YoY and QoQ. We expect GPSC’s core earnings to weaken both QoQ and YoY in 4Q26, mainly due to a further increase in pool gas costs to around Bt440/mmBTU, up 11% QoQ and 47% YoY. With the Ft rate unchanged at 16.23 satang/kWh for September–December 2026, the higher fuel costs should directly compress the SPP margin.
Medium to long-term earnings support from PDP2026. Based on GPSC’s projection of a 50,000MW increase in national green power demand by 2050 under PDP2026, GPSC is positioning itself to capture major capacity expansion opportunities. GPSC aims to participate in bidding for new power generation projects under the PDP 2026 plan, targeting at least 25% of clean electricity demand. This covers competition in the renewable energy group (solar, wind, hydro, and ESS battery), conventional natural gas power plant projects to bolster power system reliability during the energy transition, and Generation IV Small Modular Reactor (SMR) technology, where the company has prepared to become Thailand's first private sector SMR developer with a capacity of around 200–300MW per site.
Valuation & recommendations. We maintain an OUTPERFORM rating with a mid-2027 target price of Bt62, based on a DCF valuation (WACC of 6.2%, terminal growth of 2%). We still expect GPSC to benefit from the data center investment cycle in Thailand and the upcoming PDP2026, which open potential earnings upside from low-risk domestic new capacity additions, as well as potential upside from AEPL’s planned IPO in 2027.
Risks. Higher fuel cost than expected, delays in Ft adjustment, lower return on new investments, and regulatory changes regarding GHG emissions. Key ESG risk is the environmental impact from its exposure to fossil fuels.